Categories Blog, Tips

The Process Behind a Kitchen Reno

Are you thinking about adding on an addition, renovating your basement, or perhaps designing a whole new kitchen? Whatever the project is, you’re probably wondering what the process is.  How long will it take? What happens next? We work with homeowners weekly, walking them through the ins and outs of their project timeline. So we thought we would share an example of the process behind renovating a kitchen to help give you a better grasp of the project timeline.

Here is an example of the timeline behind a kitchen renovation –

  • The process behind renovating a kitchen:
    • Homeowner and owner Ed meet to do a walkthrough of the project
    • The budget and contract is agreed on
    • The first step is to finalize the project design and drawings
      • Our team works alongside designers, homeowners, and the project manager to develop drawings
      • In some projects we don’t work with designers, depends on the budget.
    • We schedule the demolition crew, arrange for dumpsters and pull the right permits
    • Demo is completed
    • Framers to build the space out
    • Rough plumbing completed
    • Rough electrical work completed
      • Did you know we have our own team of electricians over at McDonald Electric?
    • Schedule all inspections for the electrical and plumbing work
    • Walls are insulated
    • Framing inspection is completed
    • The team closes up walls
    • Walls are primed
    • New flooring is installed
    • Cabinets are installed
    • Countertops are put in
    • All tile work is completed, such as the backsplash
    • Hardware, appliances, and faucets are installed
    • The floors get sanded and stained (if hardwood floors)
    • The final painting is completed
    • The electricians and plumbers do their final work, such as installing light fixtures
    • All final inspections are done

We hope you find this helpful! Please don’t hesitate to reach out with questions!

Categories Blog, Recent Work

Rue Magazine Feature

We’re excited to share that our work has been featured in Rue Magazine.  The talented team of designers at Lawless Design wanted to update this classic Victorian home, located in Newton Centre, MA, without compromising on the character. The homeowners and designer agreed to create a home that was “Scandinavian, with a twist.”  Our team stepped in to bring their vision to life.

Great work to the entire team – this is a stunner. Click here to read the full article.